BuildXpress Depot · Los Angeles, CA
One single-family lot can legally become up to four homes. We handle feasibility, design, the ministerial permit path and the construction — one licensed, family-run team from first survey to final keys.
BuildXpress Depot since 2023 · 30+ years of family trade experience
Senate Bill 9 rewired what a single-family lot in California can do. Since 2022, most R1 parcels can be split into two lots, and each lot can hold up to two units — approved ministerially, meaning the city checks objective standards instead of holding hearings. In a city where land is the expensive part, that's the closest thing to a legal cheat code Los Angeles homeowners have ever been handed.
But SB9 is a paperwork-and-dirt business: parcel maps, surveys, utility easements, grading, fire access, then real construction. That's why you want one accountable builder rather than a chain of consultants. BuildXpress Depot — family-run, licensed and bonded, CSLB #1137171 — runs the whole play:
SB9 is powerful but not magic. The lot-split route carries a three-year owner-occupancy affidavit. Some parcels fail on hazard overlays or geometry. Sometimes the smarter answer for your lot is a detached ADU — cheaper, faster, no split required. We model both and show you the comparison before you commit. We'd rather lose a lot split than build you the wrong project.
Case Study · San Fernando Valley
Friar Street shows the core SB9 skillset on a live project: we took a single Valley parcel and developed it into two independent dwellings — a fully remodeled main house and a new-construction detached unit with its own address, kitchen, laundry and HVAC — plus a new pool and landscape, sequenced under one contract. The same discipline (site logistics, utilities, inspections, two habitable units delivered in parallel) is exactly what an SB9 two-unit or four-unit build demands.
If your parcel qualifies for the split itself, we bring in the licensed surveyor and civil engineer, and the construction side is already proven.
Homeowners who want to house parents or adult kids on their own deed. Owners of wide, flat Valley lots in Reseda, Canoga Park or Northridge sitting on more land than house. Families who want to sell half the lot to fund the build on the other half. If that's you, start with the free feasibility check below — it costs nothing to find out what your parcel is worth as buildable land. For estate-scale single-home work instead, see our general contracting in Hidden Hills.
SB9 (2021) lets owners of most single-family (R1) lots in California do two things ministerially — without a public hearing: split one lot into two, and build up to two homes on each resulting lot. Combined, one parcel can become up to four units.
Key tests: single-family zoning, each new lot generally at least 1,200 sq ft with a roughly 60/40 minimum split, not in certain hazard or historic overlays, and no recent tenant displacement on the property. We run a feasibility check on your exact parcel before you spend anything on design.
For a lot split, SB9 requires the owner to sign an affidavit intending to occupy one unit as a primary residence for at least three years. Building two units on one lot without splitting does not carry that requirement.
Yes. ADUs add units to your existing lot; SB9 can create a second sellable lot — a fundamentally different financial outcome. Many projects combine them. We model both paths for your parcel and show you the numbers side by side.
Feasibility, architecture and engineering through our in-house design team, coordination of the survey and parcel-map work with licensed surveyors and civil engineers, city processing, and the construction itself — grading, utilities, foundations, framing through finishes.
Ministerial review is the fast part; realistic full timelines run from several months for mapping and permits plus a construction schedule that depends on what you build — a single new unit is quicker than four. We give you a dated schedule with the contract.
Let's Build
Send your address and goals — we'll tell you what your lot allows under SB9 and ADU law, and what it would take to build it.